Viewpoint Systems, Inc.
800 West Metro Park
Rochester, NY 14623
Phone: 585.475.9555
Fax: 585.475.9645
Viewpoint Data Management, LLC.
800 West Metro Park
Rochester, NY 14623
Phone: 585.475.9555
Fax: 585.475.9645
Viewpoint News, Challenge 2009
Challenge: if you are replacing an existing test system, before you implement the new system, measure some key performance indicators (KPIs) on the old system and then do the same on the new system.
Then you can analyze if the new system benefited the company. Possible KPIs are:
Test cycle time
Floor space usage
Annual maintenance time
Usage count of design team reviewing of test results per year
Capital equipment costs (note purchase dates to allow inflation adjustments)
Results reporting time (form filling and form printing for unit\batch\lot)
Test data management time
Usage count of quality, Lean, or Six Sigma teams in reviewing test results
Amount of code reuse from product design and reliability groups (VI or function count)
I think it would be interesting to
conduct a study of KPIs used by those responsible for test. The
goal would be to share KPIs deemed beneficial for justifying a new test
system. Would this collection be something that you would be interested
in? I’m open to ideas so email
me, even if you just want
to let me know you’re interested in participating.